This is what 22 Goodband looked like at purchase


05_2.jpg


Part of clean up that was condition of purchase


11_8.jpg


12_9.jpg


Garage / shop out front


after the fires it still took 3 full size roll offs


upstairs of garage


side view


20_17.jpg


it came with everything, in the yard


dsc00591.jpg


foundation was cinder block and failing


dsc00593.jpg


dsc00595.jpg


dsc00596.jpg


dsc00597.jpg


I used the Wylie Coyote method of removing roof


After the fire department refused to burn it down, renovation started by lifting


dsc00704.jpg


dsc00711.jpg


dsc00713.jpg


Almost 2 ft. up, frame constructed inside


original joists bowed over 3 inches, sistered with new 2x12's


sitting on interior frame


block foundation removed


dsc00978.jpg


upstairs


dsc01862.jpg


dsc01864.jpg


dsc03910.jpg


dsc03911.jpg


dsc03912.jpg


dsc03913.jpg


dsc01867.jpg


dsc01869.jpg


dsc04763.jpg


wood foundation in place


upstaris lowered onto foundation, interior frame removed


lowered slowly so old joists could straighten out


dsc02788.jpg


dsc03392.jpg


ready for backfill


2x4 floor over old concrete


foam in floor


floor half decked


dsc03679.jpg


new electrical service


wring


new panel


new garage


dsc04228.jpg


dsc04229.jpg


dsc03709.jpg


dsc03795.jpg


dsc03930.jpg


dsc03960.jpg


dsc03971.jpg


dsc04035.jpg


with new roof


img_1596.jpg


new roof in progress


dsc04965.jpg


new unified dormer


dsc04972.jpg


img_1026.jpg


img_1037.jpg


upstairs wiring


img_1476.jpg


img_1481.jpg


img_1541.jpg


img_1552.jpg


img_1553.jpg


upstaris painted


img_1571.jpg


img_1575.jpg


img_1581.jpg


img_1583.jpg


beginning siding


img_1669.jpg


img_1674.jpg


it's done


img_2007.jpg


img_2009.jpg


img_2010.jpg